The large-scale, ground-mounted solar systems are an excellent way to ensure UK energy independence and support nature recovery. You can combine this renewable energy source with conservation measures like setting aside wildflower meadows or shade zones for grassland. These areas are ideal habitats for wildlife such as pollinators, insects, and birds.
Prices
The costs of solar energy depend on many factors, including location, angle of the sun, and roof type. These costs can be further affected depending on the number of panels installed and the quality of the electrical connections. In addition, the costs of land preparation can add up to several thousand dollars. Here is a list of typical costs for solar energy projects.
A recent report from the International Renewable Energy Agency (IRENA) shows that the costs of solar energy, wind energy, and lithium-ion batteries have dropped dramatically over the last decade. In 2010, a megawatt hour of solar photovoltaic power cost $378. In 2019, it was only $68. The reduction in costs can be attributed to consumer preferences that are shifting away from dirty fossil fuels to renewable sources of energy.
Carbon footprint
The carbon footprint of Solar Energy is the total CO2 emissions generated by the construction, operation, and production of solar panels. Solar panels have several components, including mirrors, heat-exchange fluid, and engines and generators. Transmission lines and substations also contribute to the solar power plant's carbon footprint.

Even though solar energy produces less carbon than other forms of energy, it still has significant environmental consequences in terms of land use and waste generation. Solar power plants, for example, occupy large areas of land. About 32 acres are required to generate enough power for 1000 homes. Nearly 19 million acres would be required to power the entire US.
Climate change
Renewable energy is an integral part of the global response against climate change. However, increasing temperatures are also a threat to our planet. These extreme weather events have an increasing frequency and severity, which has negative effects on both the environment and the human population. Six of the 10 costliest events occurred between 2004 and 2008, and their costs are expected to rise for years to come.
Climate system changes are constant. Factors such as solar power and human activity have caused this. The energy budget of Earth is a measure of how much energy the Earth receives from the sun. A positive energy bill results in warming. A negative energy budget causes cooling.
Future solar power requires land
According to Department for Business, Energy and Industrial Strategy, the future generation of 1MW solar electricity will require approximately two to four acres. If this assumption is true, the UK will need 700km2 of land in order to produce this amount solar energy by 2035. This represents 0.3% total UK land. Below is an estimate of the land required to meet the government’s targets. The additional land needed would be equivalent to about the size of golf courses.
UK's combined solar farms were capable of producing 14GW in 2013. The UK government would need quarter of this amount of land to expand the technology. However, this figure is still less than a quarter of the land required for all UK solar power. It could increase even further. Around 40% of UK land was used for agriculture as of 2019, and an estimated 70% of this land was used for farming.

Timescale for installation
Solar energy installation in the UK may take longer than expected. Large projects can take six months to get approved by the government. Installing solar panels in your home is a great way to save money. An average UK home uses around 3,000 kWh per year of electricity, which results in very little CO2 emissions. A steady supply of electricity can be provided by solar panels. This is in addition to helping people living on remote islands that have limited or no infrastructure.
Installation of residential solar panels typically takes one to two days. This includes the installation and wires, inverter, mounting system, and solar panels. If the solar installer needs to order mounting equipment and panels, this may extend the process by six to eight weeks. The size and complexity a solar installation determines the length of the installation.